high-occupancy love

Definitions

Sorry, no definitions found. Check out and contribute to the discussion of this word!

Etymologies

Sorry, no etymologies found.

Examples

  • Slugging is a Washington-area tradition dating back to the mid-1970s, when high-occupancy vehicle (HOV) lanes were constructed on Interstates 95 and 395 to combat soaring gas prices.

    Slugging king LeBlanc wields power in D.C.'s carpooling community

  • That shift is expected to last for 18 to 24 months as crews build the high-occupancy toll lanes between the Springfield interchange and the Dulles Toll Road.

    Dr. G's tips

  • On I-395/I-95, commuters have discovered the world of slugging, in which drivers pick up passengers at carpool lots so they can use the high-occupancy vehicle HOV lanes.

    Arlington's roadblocks to traffic relief

  • That shift is expected to last for 18 to 24 months as crews build the high-occupancy toll lanes between the Springfield interchange and the Dulles Toll Road.

    Dr. G's tips

  • That shift is expected to last for 18 to 24 months as crews build the high-occupancy toll lanes between the Springfield interchange and the Dulles Toll Road.

    Dr. G's tips

  • Did everybody win last week when Virginia formally abandoned its crippled plan for high-occupancy toll lanes north of the Capital Beltway?

    New HOT lane plan doesn't move everyone

  • Under the state's original plan for converting the high-occupancy vehicle, or carpool, lanes into HOT lanes, Zimmerman said, "we were looking at a proposal that would squeeze a lane in and put single-occupancy vehicles on it."

    New HOT lane plan doesn't move everyone

  • Under the state's original plan for converting the high-occupancy vehicle, or carpool, lanes into HOT lanes, Zimmerman said, "we were looking at a proposal that would squeeze a lane in and put single-occupancy vehicles on it."

    New HOT lane plan doesn't move everyone

  • Did everybody win last week when Virginia formally abandoned its crippled plan for high-occupancy toll lanes north of the Capital Beltway?

    New HOT lane plan doesn't move everyone

  • That shift is expected to last for 18 to 24 months as crews build the high-occupancy toll lanes between the Springfield interchange and the Dulles Toll Road.

    Dr. G's tips

Comments

Log in or sign up to get involved in the conversation. It's quick and easy.